Is the PA Turnpike under construction?

Is the PA Turnpike under construction?

Construction will begin in March of 2020 with an anticipated completion date of September 2022. For information on other sections of the Pennsylvania Turnpike currently in construction or design, please visit the Major Design and Construction Projects homepage.

Are they widening the PA Turnpike?

This $117M project will consist of the staged construction for full depth reconstruction and widening of the Pennsylvania Turnpike from two lanes to three lanes in each direction. New Enterprise Stone and Lime, Company was awarded the construction contract in December 2020. Work will begin in January of 2021.

What is construction on PA Turnpike?

Pennsylvania Turnpike begins 7.5-mile widening project near Somerset. The Pennsylvania Turnpike will begin work Monday on a 7.5-mile, $117 million project to widen more than 7 miles of the toll road in Somerset County from two lanes in each direction to three. The project, which has New Enterprise Stone and Lime Co.

Why is 476 called the Blue Route?

That was the color used to mark this route on the 1950s maps that showed three possible routes for the highway that became Interstate 476. The official name of the highway that bisects the western suburbs from Chester to Plymouth Meeting used to be the Mid-County Expressway.

IS 476 in PA a toll road?

Interstate 476 begins at Interstate 95 in urban Chester, Pennsylvania. The tolled portion of the route serves both commuters in Montgomery County and travelers bound for the Pocono Mountains in northeastern Pennsylvania.

When did they start building the Blue Route?

Work started on the Blue Route in July 1967 between Darby Road in Haverford Township to Tower Lane in Radnor Township. By 1978, almost nine miles had been built, but only three miles from I-76 in Upper Merion Township to Chemical Road in Plymouth Township were opened to traffic in January 1979.

Is I-476 in PA a toll road?

Is I-476 the PA Turnpike?

I-476 is a north/south highway extending from the suburbs of Philadelphia to Clarks Summit, north of Scranton. North of Plymouth Meeting, I-476 becomes the Northeast Extension of the Pennsylvania Turnpike, a toll highway that runs on the same ticket system as the mainline of the Pennsylvania Turnpike (I-76/I-276).

Where is the turnpike roadwork on I-476 in Pennsylvania?

CLEARED: Turnpike Roadwork on I-476 PA Turnpike northbound between Exit 20 – Pennsylvania Turnpike I-276 and Exit 3… https://t.co/xo6zYWn2rg CLEARED: Turnpike Roadwork on I-476 PA Turnpike southbound between Exit 131 – I-81/US 6 and Exit 122 – Keyser Ave affecting the right lane

How long does it take to drive from I-476 to 74?

Current I-476 Pennsylvania Traffic Conditions Length 38.9mi (Exit 115 to Exit 74) Normal Travel Time 35 mins Current Travel Time 39 mins Expected Delay 4 minutes Weather Clear – 82° F – 10 mph wind

Where did the accident happen on I-476 South in Ohio?

The accident took place on I-476 south between Route 903 and the Mahoning Valley. All lanes were blocked between exits 87 and 74. It reopened around 2 a.m. on Wednesday.

What is the final segment of I-476 in Pennsylvania?

The final segment of I-476 opened was the direct connection to the Northeast Extension (PA 9 at the time) and Interstate 276. This short segment of highway includes a large toll plaza and directional cloverleaf interchange at I-276.