What is Al dur2 IWPP?

What is Al dur2 IWPP?

Al Dur2 IWPP is an Independent Water and Power Project located at Al Dur in the Kingdom of Bahrain. The Plant shall be developed to generate 1,500 MW of Power based on Combined Cycle Gas Turbine (CCGT) technology and produce 50 MIGD of water through Sea Water Reverse Osmosis (SWRO) technology.

Who is the EPC contractor for the al Dur IWPP project?

Shandong Power Construction Company III is the EPC contractor for the Al Dur IWPP Phase II project. Image courtesy of Powerchina. ACWA Power, in consortium with Mitsui and Al Moayyed, is developing the Phase II Al Dur independent water and power project. Image courtesy of Powerchina. The power generation capacity of the project will be 1.5GW.

What is the size of the proposed al Dur project?

The proposed project has a footprint of approximately 192,500m2, and is located immediately south of the existing Al Dur Phase I IWPP Plant, adjacent to the Arabian Gulf coastline in the Southern Governorate of the Kingdom of Bahrain.

What does IWPP stand for?

The phase two of the Al Dur independent water and power project (IWPP) under construction in Bahrain will have 1.5GW of gas-fired, combined-cycle power generation capacity, and 50 million imperial gallons per day (MIGD) of water processing capacity.