How much is the Meralco meter deposit?

How much is the Meralco meter deposit?

1. What is a meter deposit? It is an amount previously required from customers during application for a new service connection to guarantee against loss or damage of the electrical meter installed. The deposit was equivalent to one-half of the cost of the electric meter and its accessories.

How can I get electricity connection in the Philippines?

Philippines – Getting Electricity Connection by Residence Owners

  1. Gather all the required documents and go to the Meralco branch nearest to you.
  2. Submit the application form and the required documents.
  3. Get a Service Application Number.
  4. Pay your Bill Deposit.
  5. Sign the Electric Service Contract.
  6. Get the meter socket.

What is CFEI Meralco?

The Certificate of Final Electrical Inspection (CFEI) is a necessary document issued by your local government unit (LGU), which should be submitted to Meralco to ensure that electrical wirings were inspected and found to be compliant with the provisions of the Philippine Electrical Code and other applicable government …

How do I check my Meralco meter reading?

There are two ways to view your electronic bills.

  1. Via email notification. Click the link to your electric bill in the bill notification sent to your registered email address.
  2. Via Meralco Online. Log in to your Meralco Online Account and access the View Bills facility.

How long is Meralco installation?

For Ordinary Service Application (includes service drop and meter installation only) – 3 days. For Project Covered Application (includes 1-5 poles and transformer bank) – 7 day. For Project Covered Applications (with more than 5 poles and transformer bank) – 20 days.

What is a rec meter?

A REC meter is a separate meter measuring the energy output of the Customer’s renewable resource distributed generation.

Can I check my Meralco bill online?

Where can I view my payment transaction? All payments, using Meralco Online or other channels, are viewable in the payment history page of your Meralco Online account. To visit the payment history page, please login to your Meralco Online account, click on Bills & Payments, then Payment History.

Does Meralco install submeter?

Meralco personnel are not allowed to install sub-meters. Customers are in charge of the purchase and installation of the sub-meters. The customer however may seek assistance from an electrical experts Certified by Meralco (CBM) for the proper installation of a sub-meter.

How to install a service entrance at your Meralco premises?

Meralco will conduct an on-site inspection of the availability of facilities and condition of the customer premises being applied for. Begin construction of your service entrance. Customer will acquire the meter socket from the nearest Meralco business center to be used in the installation of the service entrance.

What are the different voltage levels offered by Meralco?

Meralco only offers the following voltage levels: Secondary Voltage Levels: 230V, 460V, 400/230V. Primary Voltage Levels: 20kV and 34.5kV. For residential services, the standard nominal voltage is 230V in accordance to the provisions in the Philippine Electrical Code (PEC)

How do I apply for a Meralco business license?

If you are from any of these areas, just visit your nearest Meralco Business Center and we’ll help you apply in 3 quick steps: 1. Present 1 valid government ID and the application form. If you are an existing Meralco customer, you just need to present 1 valid government ID. Additional documents may be required for new customers.

How is the Meralco cash advance fee computed?

The fee will be computed based on the customer’s required facilities following Meralco’s inspection and initial design of the electric service installation. Meralco officially provides the computation through a Cash Advance letter to the customer. Similar to bill deposit, the cash advance fee is refundable.

author