What are the preparation for a load line survey?

What are the preparation for a load line survey?

Preparation for Load Line Survey: A visual examination of loadline certificate and all other certificates to ensure that they are valid and properly endorsed. General inspections to ensure NO MODIFICATIONS are carried out to the conditions of assignment of freeboard.

What is the purpose of load line survey?

In addition to the association with reserve buoyancy and stability, load lines make it possible to determine, with reasonable accuracy by draft survey, the amount of cargo on board a ship. A draft survey is used to determine the weight of any materials being loaded into or discharged from a vessel.

What are the parts of load line mark?

The complete Load line markings consist of 3 vital parts. Deck Line – It is a horizontal line measuring 300mm by 25mm. It passes through the upper surface of the freeboard. Load Line Disc – It is a 300mm diameter and 25mm thick round shaped disc.

How do you prepare a ship for a survey?

The vessel should be clean and free of personal items. Items blocking any hatches of panels need to be moved or removed to allow access. Vessel papers need to be on board such as Documentation, Registration etc.

Why is the Plimsoll line important?

Plimsoll mark on the hull of a floating ship. The Plimsoll line is a reference mark located on a ship’s hull that indicates the maximum depth to which the vessel may be safely immersed when loaded with cargo.

How should load lines and marks be marked?

Ships must have a load line mark located amidships on both sides to indicate the maximum allowable draught under specified conditions (geographical and seasonal).

What is ship survey and vetting inspection?

Vetting inspection is a grading system of a ship, enabling a potential charterer to compare between similar ships and choose the best for his needs, to maximize efficiency.

What is a load line certificate?

Load line certificate certifies that vessel complies with the loadline convention. Loadline convention basically limits the ships on the minimum freeboard it needs to maintain.

How to prepare for a load line survey?

Mentioned below are some important points that needs to be considered while preparing for a load line survey: 1. Check Access Points: Access points at enclosed structures should be checked. All movable parts (clamps, dogs etc.) should be well greased. Gaskets and watertight packings should be checked for cracks and repaired accordingly.

What are the conditions for free board and load line certificate?

These are the conditions which must be met before free board is assigned to a ship and load line certificate is issued following a load line survey. Free boards are computed assuming ship to be a completely enclosed and water tight / weather tight envelop.

What conditions must be met before assigning the load line?

Following are the conditions which must be met before assigning the load line. Enough structural strength should be possessed. Enough reserve buoyancy should be possessed. Safety and protection of crew. Prevent entry of water through hull.

What lines should be inspected in a construction site?

12. All Lines Should Be Ready For Inspection: The deck line, load line mark, load line, draught marks, important signages etc. should be de rusted and painted for inspection.

https://www.youtube.com/watch?v=8RXFfrozqRg

author

Back to Top