What is the price of cement pipe?
What is the price of cement pipe?
Questions & Answers on RCC Pipes
Pipe Type | Min Price | Max Price |
---|---|---|
RCC | Rs 180/Meter | Rs 1200/Meter |
RCC | Rs 250/Piece | Rs 5500/Piece |
Spigot | Rs 400/Meter | Rs 500/Meter |
Spun Pipe | Rs 180/Meter | Rs 200/Meter |
What is NP4 Hume Pipe?
The NP4 heavy-duty, non-pressure pipes are one of a kind that can be used for irrigation, drainage and for cross drains with heavy culvert traffic frequency. A hume pipe can withstand internal and external pressure well, and is primarily used for sewer pipes, agricultural waterways, and residential construction.
How is RCC pipe area calculated?
The volume of the RCC pipe = π/4 × (D2- d2) × L. = 0.7855 × 0.32 × 2.5 = 0.6284 cubic meter. As you know, the density of RCC is 2500kg/cu. mtr.
What is the difference between NP3 and np4 pipes?
Basic Difference between NP2, NP3 & NP 4 is due to quality of product. The thickness is not main difference. NP 2 is used for normal flow and condition. NP 3 & NP 4 is used for heavy work for durability also prefer higher class.
What is NP2 full form?
NP2. Nucleoside Phosphorylase-2. Copyright 1988-2018 AcronymFinder.com, All rights reserved.
What is NP2 and NP3 pipes?
‘Spigot and socket ended pipes shall be used for water mains, sewer, irrigation and culverts/cross drains Flush jointed (NP3 and NP4) and collar JOinted (NP2) pipes shall be used for culverts/cross drains only (see Fig. 17, 18 and 19 for pipes manufactured by spinning process.
What is the difference between NP3 and NP4 pipes?
How is hume pipe area calculated?
Plug in L and D into the following equation to calculate the surface area of the pipe: 3.14 x L x D. For example, if you had a pipe with a length of 20 feet and a diameter of 2 feet, you would get 3.14 x 20 x 2 and find that the surface area of the pipe equals 125.6 square feet.
How do you measure hume pipe size?
Total area of 300 mm Diameter Hume Pipe =3.14 X (Diameter/2)2 =3.14X(300/2)2. Total area of 150 mm Diameter Hume Pipe=70650 Sq.mm. Actual Fill up Area of Hume Pipe =40% X Area of Conduit =40% X 70650. Actual Fill up Area of Hume Pipe =28260 Sq.mm.