Can you walk on the Linn Cove Viaduct?

Can you walk on the Linn Cove Viaduct?

Although you cannot stop or walk along the viaduct, several overlooks and hikes give spectacular views of this engineering feat. To protect the fragile habitat of Grandfather Mountain, Parkway planners designed the Linn Cove Viaduct.

How do I get to Linn Cove Viaduct?

Take a one-mile round-trip hike for an up-close view of this engineering marvel. An accessible paved trail begins at the visitor center and leads to a beautiful view of the Viaduct from underneath, and gives hikers access to the Tanawha Trail.

What highway is the Linn Cove Viaduct?

The bridge is located in the Boone Area heart of the North Carolina High Country at Milepost 304 on the 469-mile route between Shenandoah National Park in Virginia and Great Smoky Mountains National Park in North Carolina and Tennessee.

What elevation is Linn Cove Viaduct?

4,100 feet
It is is 1,243 feet long and is made up of 153 pre-cast segments weighing 50 tons each. It is the world’s most complicated concrete bridge and cost over $10 million to construct. The views from the viaduct are astounding, since the bridge stands at an elevation of 4,100 feet.

Who built the Linn Cove Viaduct?

Jean M. MullerLinn Cove Viaduct / ArchitectJean Muller was a French bridge engineer who focused on design and construction of concrete bridges. Wikipedia

How long is the Linn Cove Viaduct?

1,243′Linn Cove Viaduct / Total length

The Linn Cove Viaduct is 1,243 feet long and is made up of 153 segments weighing 50 tons each.

Where can I take pictures with Linn Cove Viaduct?

If you want an easier way to get a photo of the Viaduct, albeit an inferior one, drive down to the Yonahlossee Overlook and get one from there. If you want that Souvenir Store photo, standing underneath the Viaduct at the end of the Linn Cove Viaduct Overlook Trail is where you need to start.

How long did it take to build the Linn Cove Viaduct?

eight years
The groundbreaking construction involved setting into place 153 50-ton concrete segments onto footing supports. Each one of the 50-ton concrete segments was precast at an indoor facility just to the south of the bridge. It took eight years to complete the Linn Cove Viaduct. The new bridge officially opened in 1987.

When was the viaduct built on Blue Ridge Parkway?

1979Linn Cove Viaduct / Construction started

What city in NC has the highest elevation?

Beech Mountain
The town is located atop Beech Mountain and is the highest town east of the Rocky Mountains at 5,506 ft (1,678 m) in elevation….

Beech Mountain, North Carolina
Elevation 5,506 ft (1,678 m)
Population (2010)
• Total 320
• Estimate (2019) 324

How much did the Linn Cove viaduct cost to build?

Completed in 1983, at a cost of almost $10 million, the Linn Cove Viaduct is 1,243 feet long and contains 153 segments weighing 50 tons each. The American Society of Civil Engineers designated it a National Civil Engineering Landmark.

How do I get to the Linn Cove Bridge?

By parking at the Linn Cove Visitor Center, at Milepost 304.4, walkers can take a paved wheelchair-accessible path a hundred yards to look up beneath the high-tech bridge. Take the Tanawha Trail farther over more rugged terrain and it is one-half mile to the postcard view of the viaduct, reached by a short side trail to a rocky perch.

When was the first viaduct built on the Rocky Mountains?

The earliest of these is the Rocky Mountain Viaduct, constructed in 1937, on the northern section of the parkway at milepost 35. This steel girder structure is supported by arched stone piers and stone-faced abutments, and is the only viaduct to feature this treatment.

Why did parkway designers create the viaduct?

Parkway designers created the viaduct to protect the fragile environment of Grandfather Mountain. Viaducts are elevated roadway sections carrying the road high above dry ravines or across the shoulders of mountains where extensive and aesthetically unpleasing fill sections would otherwise be required.

author

Back to Top