Is code for dynamic load test on pile?
Is code for dynamic load test on pile?
C,(14) Dynamic Load Tests, and D4945-89 of the American Society for Testing and Materials (ASTM). D4945-89 is entitled “Standard Method for High Strain Testing of Piles.”
What is ultimate load test for piling?
6.2. 7 Ultimate capacity condition. In a static pile load test, the ultimate capacity is defined as when a rapid movement occurs under constant or slightly increased load.
Is code for routine load test?
-2911
The Maintained load method as described in Clause 6.2 of IS-2911 (Part IV) – 1985 shall be followed for loading for the Routine Tests.
Is Code pile integrity test?
This is a system of assessing the integrity of piles by the use of low stress wave imparted to the pile shaft and is also known as Sonic Integrity or Sonic Echo Test. A small metal/hard rubber hammer is used to produce a light tap on top of the pile.
What is the pile load test?
Static pile load testing is one of the most common methods for testing the actual in-situ capacity of a pile. The test program involves the direct measurement of pile head displacement in response to a physically applied load. Piles can be tested for compression, tension or lateral loads. …
What is a pile load test?
Is pile a code?
Following are the Indian Standard Codes on Pile Foundations: IS 2911 : Part 1 : Sec 1 : 1979 Driven cast in-situ concrete piles. IS 2911 : Part 1 : Sec 2 : 1979 Bored cast-in-situ piles. IS 2911 : Part 1 : Sec 3 : 1979 Driven precast concrete pile.
How is the test pile loaded?
The test pile is loaded by utilizing a hydraulic jack that is placed on the center of the test pile. The applied load is measured with a load cell placed between the hydraulic jack and the pile or by a pressure gauge installed between the pump and the jack.
What is the procedure for loading of piles in is-2911?
Loading for Initial Tests is conducted as per Appendix ‘A’ Clause 6.3 of IS-2911 Part IV . Selection of piles for the Routine Test is done based on number of piles required subject to maximum of ½% of total number of piles required. The number of tests may be increased to 2% depending on the nature / type of structure.
How long does an ASTM load test take?
This kind of test is the ASTM standard procedure and the most common test, especially in large projects. A typical test lasts between 1.5 to 3 days. Quick Maintained Load Test (QML) In this procedure, 15% of the design load is added at a time and held for 5minutes.
How long should a load be maintained on a pile top?
Each load shall be maintained till the rate of displacement of the pile top is either 0.1 mm in the first 30 minutes or 0.2 mm in the first one hour or 2 hours whichever occurs first. The next increment in the load shall be applied on achieving the aforesaid criterion. The test load shall be maintained for 24 hours.