What is the difference between Navisworks Manage and Navisworks Simulate?

What is the difference between Navisworks Manage and Navisworks Simulate?

Simulate is the base level and includes the functionalities except for Clash Detective. Manage on the other hand is the top level and includes all features.

What is Navisworks Manage?

Autodesk Navisworks Manage software is a comprehensive project review solution that supports coordination, analysis, and communication of design intent and constructability. Entire project models can be published and viewed using Autodesk Navisworks Freedom software.

How do I use Navisworks Manage for clash detection?

Click on Add-Ins tab > External Tools > Navisworks SwitchBack to enable it. In Navisworks Manage, Clash Detective window, on the Results tab, click the SwitchBack button. Revit will load the relevant project, find and select the item, and zoom to it.

How do I create a clash detection report on navisworks?

To Create a Clash Report

  1. In the Clash Detective window, run the desired test.
  2. Click the Report tab.
  3. In the Contents area select the check boxes for the data you want to appear in the report for each clash result.
  4. In the For Clash Groups Include drop-down list, select how to display the clash groups in your report.

Does Navisworks Manage include Navisworks Simulate?

Both Navisworks Simulate and Manage include the following functionalities: Timeliner, BIM tools, Quantification, Rendering, Animator and Data tools. The main difference between them is the Clash Detection, which is only available in Manage.

Is Navisworks Manage free?

Try Navisworks Manage free for 30 days. Review integrated models and data with stakeholders to gain better control over project outcomes.

What is Navisworks Manage 2020?

Navisworks Manage is a design simulation, clash detection, and advanced coordination software.

What is Navisworks Manage 2018?

Autodesk Navisworks 2018 is a comprehensive project review solution that supports 5D simulation, coordination, analysis, and communication of design intent and constructability. Real-time navigation combines with a review toolset to support collaboration among the project team.

How do you simulate clash in Navisworks?

In Summary

  1. Run Navisworks Manage to run a clash test.
  2. Report clash results as Viewpoints.
  3. Publish the model to an NWD file.
  4. Open the NWD file with Navisworks Simulate.
  5. Select the clash viewpoints in turn.
  6. Use Switchback to locate the clashing items in the authoring CAD application.

Can you do clash detection in Navisworks Simulate?

The Clash Detective tool enables you to search through your total project model, identifying cross-discipline interferences (clashes) earlier in the design process. This feature is available for Autodesk Navisworks Manage users only.

What is a clash report?

A clash report is a document shared with stakeholders on a given project using PDF, XML, HTML or another type of format. It is the “traditional” way of sharing issues found with the clash detection software and requires some extra time to set up and track problem-solving over time.

What is the purpose of clash detection?

In Building Information Modeling (BIM), clash detection is the technique of identifying if, where, or how two parts of the building (e.g., plumbing, walls, etc.) interfere with one another.

How do I perform a clash test in Navisworks simulate?

To summarise, the workflow is as follows: Run Navisworks Manage to run a clash test. Report clash results as Viewpoints. Publish the model to an NWD file. Open the NWD file with Navisworks Simulate. Select the clash viewpoints in turn. Use Switchback to locate the clashing items in the authoring CAD application.

How do I deselect a Navisworks product from the comparison?

Compare the features of Navisworks products and see which one is right for you. The default product cannot be deselected from the comparison. Please select another product to compare before deselecting this product. You have selected the maximum that can be compared.

How to write the report to PDF from Navisworks?

You cannot write the report to pdf directly from Navisworks but you can write the report to a certain format and open it in MS Excel. From there you can convert it to PDF. Please see below screenshots for your reference :

Is Navisworks included in my industry collection?

Navisworks Manage is included in our comprehensive industry collections. Try another top product from: Plan, design, construct, and manage buildings with powerful tools for Building Information Modeling. Professional-grade product design and engineering tools for 3D mechanical design, simulation, visualization, and documentation.

author

Back to Top