How long does it take to max out a town hall 12 base?
How long does it take to max out a town hall 12 base?
When a player has a gold pass, the process of maxing the Town Hall 12 base would take around 8-10 months. If the player is very active in the game, it would take less than 8 months in maxing the Town Hall 12 base.
What is the max level gold mine for th 8?
Upgrade Chart
Level | Capacity | Production Rate |
---|---|---|
6 | 20,000 | 1,300/hr |
7 | 30,000 | 1,600/hr |
8 | 50,000 | 1,900/hr |
9 | 75,000 | 2,200/hr |
What is Max spring trap for TH8?
18 housing space
The Spring Trap is unable to affect troops that take up more housing space than it can launch. As the max level Spring Trap has a capacity of 18 housing space, troops with more than 18 housing space are unaffected, such as the P.E.K.K.A or Golem.
How many gems do you need to max out clash of clans?
According to the Clash of Clans wiki the total cost of upgrading everything is 1,688,882 gems which works out to be $12,068.77.
How many days off do you get on an 8-hour schedule?
The maximum possible number of full weekends off with 8-hour shifts is 13 per year. The most common schedules that accomplish this require employees to work 7 days in row. 8-hour schedules that feature 5 or 6 days of work in a row only provide 5-6 weekends off per year.
What is the difference between 8-hour and 12-hour schedules?
Unlike the 8-hour schedules, this can be achieved under a variety of configurations with a maximum of 4 consecutive days of work. Longer breaks. In contrast with most 8-hour shift schedules that provide a maximum of 4 days off, 12-hour schedules can provide up to 8 consecutive days off.
What is the [2 on 3 off] schedule?
The [2 on 3 off] [2 on 2 off] [3 on 2 off] is also known as the Pitman schedule and allows for officers to have every other weekend off. It requires 2 squads with 2 templates each.
What is the maximum number of weekends off with 12-hour shifts?
The maximum possible number of full weekends off with 12-hour shifts is 26 per year. Unlike the 8-hour schedules, this can be achieved under a variety of configurations with a maximum of 4 consecutive days of work.