How do I track a vessel arrival?

How do I track a vessel arrival?

The automatic identification system (AIS) helps track bigger vessels crossing waters worldwide by offering real-time information about the vessels….Notable Vessel Tracking Websites

  1. Marine-Traffic.
  2. FleetMon.
  3. Shipfinder.
  4. VesselFinder.
  5. Vesseltracker.
  6. VT Explorer.
  7. myshiptracking.
  8. Cruisemapper.

How many vessels belonging to Maersk Line are currently set to arrive at the port of Seattle Washington this week?

Currently there are 443 vessels in this Port and another 20 vessels are scheduled to make a port call at SEATTLE.

How long does a ship stay in a port?

With regard to turnaround times, in 2018, ships spent a median time of 23.5 hours (0.97 days) in port. Typically, dry bulk carriers spent 2.05 days in port, container ships, 0.7 days. A shorter time in port is a positive indicator that could signal the level of port efficiency and trade competitiveness.

What is a GCT operator?

(GCT), a leading container terminal operator in North America has joined the TradeLens supply chain platform, underpinned by blockchain technology. GCT operates four strategically located, big ship readyterminals on the west and east coast of North America.

What is vessel departure date?

ETD could be the estimated departure time of the shipper’s cargo on board a vessel or that of the transport vessel itself. An ETD normally means the expected date of departure while ETA means the expected date of arrival of an ocean carrier or cargo.

What is Voyage number of a vessel?

The Voyage Number is the unique identifier for the voyage. The Voyage Name further describes the voyage for informational purposes. The Vessel ID identifies the actual equipment or ship that is used in the voyage schedule. Select the Composite check box to identify if the voyage has a transload point.

What ports do the Maersk Line go into?

Local information

  • Main office. Florham Park.
  • Port. Baltimore.
  • Port. Charleston (north)
  • Port. Charleston (south)
  • Office. Charlotte.
  • Port. Dutch Harbor.
  • Port. Houston.
  • Office. Houston.

What is port turnaround time?

In ocean shipping, the time that is taken between the arrival of a vessel and its departure is referred to as the turnaround time. The vessel turnaround time is used to measure the efficiency of port operations.

What happens when a container arrives at port?

Once the ship reaches the destined port, the container will be unloaded by the port cranes and it is transported to the port bay or warehouse using the port container trucks. Now the representative of the importer will present the bill of lading and other documents to the port and shipping line.

Who owns GCT terminals?

Ontario Teachers’ Pension Plan
Established in Vancouver in 1907, GCT is a majority Canadian-owned company with three major institutional investor shareholders, the Ontario Teachers’ Pension Plan (OTPP), British Columbia Investment Management Corporation (BCI) and IFM Investors (IFM).

Where is Howland Hook terminal?

Staten Island
The Howland Hook Marine Terminal, operating as ”’GCT New York,”’ is a container port facility in the Port of New York and New Jersey located at Howland Hook in northwestern Staten Island, New York City.

How much space is there at Port Newark container terminal?

Over 45 international destinations for shippers moving freight through Port Newark Container Terminal. 811 Million Sq.Ft. of industrial space within 1.5 Hrs of PNCT Terminal. Port Newark Container Terminal (PNCT) located in Port Newark, New Jersey occupies 272 acres, currently handling more than 1.3 million TEU’s.

How many ports does mol have?

The group also operates container terminals in seven ports overseas (three in the U.S., two in Vietnam, one in Thailand, and one in the Netherlands). The MOL Group promotes automated and hybrid operation of cargo handling at its facilities, striving to ensure safe, efficient, and environmentally friendly operations.

How big is the mamaher terminal?

Maher Terminal Primary Cargo Containers; Dimensional cargo; General C Entrance Gates Corbin Street Terminal Area 450 Acres/182 Hectares Length of Ship Berth 10,128 ft/3,087 m Container Cranes Total: 24

What does pnct’s expansion mean for the port of New York?

PNCT secured a long-term extension of its lease agreement with the Port Authority of New York/New Jersey through 2050. PNCT’s total expansion will add 1.0 million TEU’s of capacity, effectively adding an additional terminal to the Port of NY/NJ.

author

Back to Top