How much does outline planning cost in Scotland?

How much does outline planning cost in Scotland?

The cost for an outline planning permission is £460 for each 0.1 hectare of an, and £230 for a householder application. In Scotland, both a full permission application on a new house and an outline application costs £401 while a householder application is £202.

How many objections do you need to stop planning permission in Scotland?

However, generally speaking 5 – 10 good objections are often enough to get an application ‘called in’ to a committee meeting for councillors to decide (although this does differ between local authorities). Otherwise a case officer (with management supervision) may make a decision under ‘delegated powers’.

How does the Scottish planning system work?

The planning system exists to regulate the use of land and buildings by granting or refusing planning permission. The effect of the planning system’s decisions should be to help increase sustainable economic growth, which is the main purpose of the Scottish Government.

How much does a building warrant cost in Scotland?

Building warrant where work has not started

Value of building work Warrant fee Certificate discounts
£0 – £5,000 £150 £30
£5,001 – £5,500 £169 £40
£5,501 – £6,000 £188 £40
£6,001 – £6,500 £207 £40

Can planning permission be overturned in Scotland?

When you make a planning permission appeal, you cannot change the terms of the proposed development – it must be the same as the proposal that was considered previously by the council, using the same plans.

How long does it take to get planning permission in Scotland?

Planning authorities aim to reach a decision within 4 months of receiving a valid application for major developments and 2 months for local developments. Find more information on how the planning system works on the Scottish Government website.

What size of garage can I build without planning permission Scotland?

The height of the garage is not higher than 4 metres. Any part of the garage within 1 metre of the boundary cannot be higher than 2.5 metres. The height of the eaves is not higher than 3 metres. If you are in a conservation area or are close to a listed building, the garage cannot exceed 4 square metres.

How much does an architect cost Scotland?

You can expect to pay an architect between 5 – 12% of the whole construction cost.

What happens if you build without a building warrant?

If a warrant is not obtained this will lead to additional costs for the processing of a completion certificate that will normally be required when selling your property. The verifier may also require work to be opened up to show that compliance with the regulations has been achieved.

When do planning fees go up in Scotland?

The provisions for fees in the Town and Country Planning (Fees for Applications and Deemed Applications) (Scotland) Regulations 2004 take effect from 1 June 2004 and fees at the levels prescribed in these Regulations are payable for applications made on or after that date. Fees will increase by a further 10% approximately on 1 April 2005.

What is Article 4 of the Planning Act?

Article 4 relates to restrictions within local authorities preventing certain permitted development rights from being exercised. This is further expanded in Schedule 3 – Procedures for Article 4 directions . and the direction must specify that it is made under this paragraph.

Are national planning policy guidelines still relevant in Scotland?

Statements of Scottish Executive policy contained in SPPs and Circulars may be material considerations to be taken into account in development plan preparation and development control. Existing National Planning Policy Guidelines (NPPGs) have continued relevance to decision making, until such time as they are replaced by a SPP.

When did prescribe the fees for planning applications come into effect?

Prescribes the fees for planning applications made on or after the 1 June 2004. (Amended by 2/2013). This Circular supersedes SODD Circular 1/1997 and SEDD Circulars 4/2000 and 3/2002.

author

Back to Top