What do you pick out first when remodeling a kitchen?

What do you pick out first when remodeling a kitchen?

It may be more fun to plan the cabinet layout and countertops first, but always choose your major appliances first and then build the plan around those dimensions. You’ll be disappointed if you order cabinets and then find out that you only have room for a 24-inch-wide oven.

When remodeling a kitchen what comes first floors or cabinets?

Typically Cabinets Come Before Flooring. In most cases, given standard flooring heights, you will install the cabinets before the floor covering. Floor covering, or finish flooring, is the surface that you see and walk on, not the subfloor (under the underlayment) or underlayment (between subfloor and finished layer).

What should be updated first in a kitchen?

  1. Before You Update ANYTHING: Clean Like There’s No Tomorrow.
  2. Update the Kitchen Walls with a Fresh Coat of Paint.
  3. Make the Space Bright with New Light Fixtures and Bulbs.
  4. Switch Out Cabinet Hardware for Modern, Matching Pieces.
  5. Save By Bringing Old Cabinets Back to Life.
  6. New Countertops Make the Kitchen Fresh.

When remodeling a kitchen what comes last?

Phase 4: Finish Construction (1-2 months) Finish construction is when all new products are installed in the kitchen. This is the final, and perhaps most satisfying, phase of the kitchen remodeling process.

Where do I start when planning a kitchen?

You need to measure your space accurately, and put the measurements into a design program to create a layout (you might look at Sketch Up or RoomStyler). Start by laying out the main stations for your kitchen. The basics are the range/cooking area (plus your microwave), the fridge, and the sink/dishwasher area.

Do appliances or countertops go in first?

Countertops are typically installed after flooring, cabinets, and appliances. This is true for both new builds, and remodeling projects. Since countertops sit directly on the cabinets, the cabinetry must be installed prior to the final measurements, fabrication, and installation.

Does flooring go under stove?

You don’t risk dragging a stove or heavy counter over the hardwoods and scratching or otherwise damaging them. Then install the floors cleanly, right up snug to the edge of your cabinets and they’ll look great and be a tight fit.

Should you run flooring under kitchen cabinets?

Installing flooring before your cabinets is the best choice for most hardwood floors. When professionals install floors then cabinets, it’s easier to get everything to standard heights. It’s also a safer installation process for your cabinets since you won’t risk any damage to them as professionals install the floors.

How do I update my 20 year old kitchen?

How to Modernize Your Outdated Kitchen

  1. Upgrade your metals.
  2. Swap out your flooring.
  3. Consider removing your upper cabinetry.
  4. Modernize your countertops.
  5. Give people a place to sit.
  6. Get energy efficient with your appliances.
  7. Paint your existing cabinetry.
  8. Install new lighting options.

When remodeling a house where do you start?

Whole Home Remodel – Where to Start

  1. Determine what you can remodel yourself – and what requires a contractor.
  2. Determine your budget.
  3. Decide on the design and style of your home.
  4. Acquire the appropriate permits.
  5. Research builder’s risk insurance.
  6. Create a timeline and stick to it.
  7. Get started!

How long does a complete kitchen remodel take?

The average US kitchen renovation takes 6-8 weeks. Larger or more complex kitchen remodels may take anywhere from 10-12 weeks. Full, large kitchen remodeling projects will take longer, often between 3-5 months in total.

Do you tile under cabinets?

Always install the tile to the wall, under appliances and cabinets. In that time there could be water leaks, appliance failures cabinet damage that requires replacement, electrical problems that require cabinets be moved, etc… When our bathroom was re-tiled, they left the cabinet in place.

author

Back to Top