What is a method statement example?

What is a method statement example?

For example, a plan could show the location of a hazard or where welfare facilities are. You might get asked for a method statement with a risk assessment, and clients will often ask for a copy of your ‘RAMS’, which means risk assessments and method statements.

What is a method statement in a tender?

Method statements are frequently requested as part of a tender and are intended to give the company an opportunity to show how they can provide the goods or service and give the Council an insight into the company’s method of operation.

What is a electrical method statement?

Electrical method statement is used for safe implementation and construction of electrical works. Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.

How do you write a method statement?

What Do I Need to Include in My Method Statement?

  1. The name of the project and its reference.
  2. A brief summary of what the work is.
  3. Where the work is taking place (address).
  4. Start and expected completion dates for the work.
  5. The issue date and the unique document number.
  6. Details about the company carrying out the activity.

What is the main purpose of a method statement?

Method statements are documents that detail exactly how to carry out work safely. When it comes to ensuring building site health and safety, method statements are key. The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment.

Is a method statement a legal requirement?

While not required by law, method statements are also prepared for many other construction activities and are proven to be an effective and practical way to help plan, manage and monitor construction work.

Why is a method statement important?

A method statement helps manage the work and ensures that the necessary precautions have been communicated to those involved. The process of preparing a written method statement provides evidence that: Significant health and safety risks have been identified.

What is electrical installation of building?

An electrical installation is the complete system of wiring and apparatus, which is used to feed electrical energy from the position at which it is made available in the building, concerned to the point or points at which it is to be used. An electric shock is the passage of an electric current through the body.

Do I need a method statement?

Method statements are not specifically required by law in the same way that risk assessments are. But they can help you to comply with the law and the need to carry out your work safely. They are used to provide information and instruction to your team, which is a legal requirement.

How do you start a method statement?

Begin to write your method statement, starting at the header.

  1. A standard operating procedure or title.
  2. A site address.
  3. Your company name, address, logo and identifying details.
  4. Projected start and end dates for task.
  5. A description of the work to be conducted.
  6. The method statement’s author and health and safety contacts.

When would you be likely to require a method statement?

Once you carry out a risk assessment, you should create a method statement using the information outlined in the risk assessment about potential hazards and the risks they pose. The documents also need to be reviewed and rewritten whenever tasks are carried out in a new location or using new equipment.

Who Prepare method statement?

Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor. The HSE suggests that those preparing method statements should consider: Is there a safer way of doing this task?

What is electelectrical method statement?

Electrical method statement is used for safe implementation and construction of electrical works. Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.

Where can I download construction method statements for electrical work?

We also have other pages for downloading construction method statements for HVAC, Plumbing, Firefighting, and Civil Works. All safe work electrical method statement can be accessed and downloaded from our main menu on the top of this page. You can download method statements packages from below link collectively.

How can I check free electrical method statement?

You can check free electrical method statement and after that decide about downloading the full package. In addition to method statement you can find inspection and testing plan and inspection checklists for doing the work as part of method statement for electrical works.

What is a method statement in project management?

A method statement covers all the scope of work and the description of how to safely carry out a project, particularly among high-risk projects like electrical installation and construction sites.

author

Back to Top