Windscale
Work started on the Sellafield site – which was renamed Windscale – in 1947. It took more than 5,300 construction workers, engineers and architects less than five years to design and build a fully operational nuclear facility.

Where does Sellafield waste go?

Currently at Sellafield, waste is stored in silos and ponds. Only a very small amount of nuclear waste is classed as high risk. The rest can often be recycled into nuclear fuel to power thermal reactors.

Where is nuclear waste stored UK?

Between 70% and 75% of the UK’s high-activity radioactive waste, which would be designated for the GDF, is stored at the Sellafield facility in west Cumbria. The sources of the waste include power generation, military, medical and civil uses.

Is Sellafield beach safe?

The Environment Agency has reported that radioactive objects found on the beaches around Sellafield posed a “very low” risk to health. Since 2006, a detector system has been searching the beaches of Sellafield for objects, often no larger than a grain of sand, and sending them for analysis.

Where does the UK’s nuclear waste go?

How much nuclear waste is at Sellafield?

There are more than 1,000 nuclear facilities. Sellafield is the largest nuclear site in Europe and the most complicated nuclear site in the world. By its own admission, it is home to one of the largest inventories of untreated waste, including 140 tonnes of civil plutonium, the largest stockpile in the world.

What is the history of Sellafield nuclear plant?

History. Since its inception as a nuclear facility, Sellafield has also been host to reprocessing operations, which separate the uranium, plutonium, and fission products from spent nuclear fuel. The uranium can then be used in the manufacture of new nuclear fuel, or in applications where its density is an asset.

Why was Sellafield chosen as the location of the plutonium production plant?

Following the decision taken by the British government in January 1947 to develop nuclear weapons, Sellafield was chosen as the location of the plutonium production plant, consisting of the Windscale Piles and accompanying reprocessing plant to separate plutonium from the spent nuclear fuel.

Where does the water vapour come from at Sellafield?

The water vapour is from the Calder Hall cooling towers. Following the decision taken by the British government in January 1947 to develop nuclear weapons, Sellafield was chosen as the location of the plutonium production plant, consisting of the Windscale Piles and accompanying reprocessing plant to separate plutonium from the spent nuclear fuel.

What are the biggest decommissioning challenges at Sellafield?

Sellafield’s biggest decommissioning challenges relate to the legacy of the early nuclear research and nuclear weapons programmes. One building still houses the aluminium cladding for the uranium fuel rods of Piles 1 and 2, and is modelled on a grain silo, with waste tipped in at the top and argon gas added to prevent fires.