What is the maximum gap between scaffold and structure?

What is the maximum gap between scaffold and structure?

Originally Answered: What is the maximum gap between scaffold and structure? For normal maintenance work, it is 150 mm to 300mm. If you are doing the major installation of adding structural members, in such case it is 150 mm to 600 mm to facilitate enabling tools to e operated or gap to inserts member etc.

At what height do you need scaffolding?

In the general industry, the height requirement for scaffolding is 4 feet above a lower level. For construction work, the height requirement is 6 feet above a lower level. All workers 10 feet above a lower level must have fall protection.

What are the three types of scaffolding?

Workers who use scaffolds can be divided into three groups:

  • Suspended Scaffolds.
  • Supported Scaffolds.
  • Aerial Lifts.

Do scaffolders have to wear a harness?

Industry guidance requires scaffolders to wear and use a fall arrest harness when more than 4m above ground without a safe platform to stand on and edge protection in place.

Should scaffold boards be clipped?

scaffolders will sometimes tie down spare boards or incomplete scaffolds with a tube across at the end of a shift but this is never done on a complete scaffold , in my 10 years scaffolding experience all over the country on petro chem and nuke sites and offshore work , boards must be tied with clips or in some cases …

What are the three main types of scaffolds?

Do you have to wear a harness on scaffolding?

OSHA requires workers to wear a full-body harness, (one part of a Personal Fall Arrest System) when they are working on a suspended scaffold more than 10 feet above the working surface, or when they are working in bucket truck or aerial lift.

Does scaffolding need to be tagged?

Must I use a tag system on a scaffold? Although tag systems are not a legal requirement, the law does require inspection of scaffolding from which a person might fall 2 metres or more and the issue of a report by a competent person, on completion and at least weekly thereafter.