Where is 737 MAX assembled?
Where is 737 MAX assembled?
Renton
The Boeing Company’s Renton, Washington Factory is a facility where the Boeing 737 MAX airliner is built. Current production includes the 737 MAX 7, 737 MAX 8, 737 MAX 9, and 737 MAX 10 models. The floor space covered is 1.1 million square feet (102,000 square meters).
How long does it take to build a 737 max?
The present build time is reducing from 11 days (5,500 airplane unit hours of work) towards a future target of 8 days (4,000 airplane unit hours of work). The production rate has increased from 31 aircraft a month in 2005 to 42/month in 2014 and reached 57 aircraft a month by 2019 for the 737MAX.
When was the Boeing 737 MAX built?
It took its maiden flight on January 29, 2016 and was certified by the U.S. Federal Aviation Administration (FAA) in March 2017. The first delivery was a MAX 8 in May 2017 to Malindo Air, with whom it commenced service on May 22, 2017.
Is the 737 Max still being built?
Boeing’s 737 Max is back in service in most of the world, but China remains a holdout. The Boeing 737 Max 8. Boeing. Two years after it was banned from flying passengers, the Boeing 737 Max has been cleared to return to the skies in much of the world.
How many 737 MAX have been built?
Boeing appears to have delivered the majority of the 737s it has built in 2021, while most of those that were sitting in its inventory at the beginning of the year continue to languish there. As of Sept. 30, the aerospace giant still had about 370 completed 737 MAX planes in its inventory.
What is 737 MAX called now?
While Boeing has used the 737-8 designation internally, until now Boeing has externally referred to the three new versions of the 737 as the MAX 7, the MAX 8 and the MAX 9.
How many miles can you put on a 737 wire?
Assembling an airliner like the 737 requires a lot of wire. The previous version of the 737 (700, 800 and 900) has 42 miles of wire in the airframe. Aircraft wiring involves the use of wire “looms” or “bundles” to organize and install these miles of wires.
How long does it take to build a 777?
The immense, 98.3-acre facility can produce one 777 aircraft every three days for a total of seven planes per month (Boeing will increase production to eight aircraft per month next year). It takes 49 days to complete final assembly on an airliner.
Where are Boeing’s built?
Boeing manufactures seven distinct families of commercial aircraft, which are assembled in two facilities—Renton and Everett—in Washington state and one facility in California.
How many 777 are built monthly?
Commercial Airplanes Fact Sheet
Aircraft | Production Rate | Future Changes |
---|---|---|
747 Learn more | 0.5 / mo | – |
767 Learn more | 3 / mo | – |
777 Learn more | 2/mo (777 and 777X combined) | |
777X Learn more |
How many undelivered 737 MAX are there?
The company’s inventory of undelivered 737 MAXs surpassed 450 during a 21-month delivery pause from March 2019 to December 2020 related to the fleet’s global grounding following two fatal 737-8 accidents in five months.
Who uses Airbus?
Airline operators The largest operators are Singapore Airlines (56), Qatar Airways (53), Cathay Pacific (42), Delta Air Lines (22), Lufthansa (19), Ethiopian Airlines (18), Finnair (17), Air China (16), Vietnam Airlines (14), China Airlines (14) and other airlines operating fewer of the type.
How was the first 737 MAX Assembly made?
Assembly of the first 737 MAX in our Renton, Wash., facility kicks off with wing assembly for the first 737 MAX flight test airplane. Wing skin panels and stringers were loaded into the new panel assembly line and initial parts of the first 737 MAX spars – internal support structures in wings – were loaded into automated spar assembly machines.
How are 737 MAX spars made?
Wing skin panels and stringers were loaded into the new panel assembly line and initial parts of the first 737 MAX spars – internal support structures in wings – were loaded into automated spar assembly machines. When finished, the panels and spars will be transformed into completed wings.
What happens when the 737 MAX wing panels are finished?
When finished, the panels and spars will be transformed into completed wings. Line Quality inspectors inspect 737 MAX wing skin panels and stringers in the new panel assembly line that uses automation to drill holes and install fasteners in the upper and lower wing panels.
How can Boeing increase its 737 MAX production rate?
A new spar-assembly line with robotic drilling machines should increase throughput by 33%. The Electroimpact automated panel assembly line sped up the wing lower-skin assembly by 35%. Boeing planned to increase its 737 MAX monthly production rate from 42 planes in 2017 to 57 planes by 2019.