1. Determine your budget. First,decide on how much money you want to spend. This will help you keep tabs on your spending in the long run. Break down
2. Decide what you want to renovate.
3. Create a priority list.
4. Create a timeline.
5. Decide what you can do yourself.
What is a good kitchen design?
A good kitchen design can mean the difference between an average house and a really great house. The kitchen is often the center of family life. It’s probably the room that’s most commonly Remodeled and updated. It’s the most expensive room, square foot for square foot, in the entire house.
How to create the most efficient kitchen layout?
How to Create the Most Efficient Kitchen Layout Step #1: Decide on Appliances + Sink. Since I’m starting from scratch with a new kitchen, I got to decide on all new large appliances (dishwasher, fridge, rangetop, oven and Step #2: Decide on Appliance + Sink Layout. Step #3: Create Zones Around Your Appliances + Sink. Step #4: Determine Cabinet Dimensions Based on Zones.
How to begin a kitchen remodel?
Think About What You Need in Your Kitchen Remodel. This step is all about figuring out how you use your kitchen,and finding the layout and features that fit
Research and Plan. Ready to green-light that project and take the plunge?
Find the Professionals You Will Need. Unless you’re building your own kitchen cabinets and doing your own electrical and plumbing,you’re going to work with a professional at some
Settle on a Schematic Design. This phase includes sketches,space planning,preliminary floor plans and elevations showing the layout and cabinet sizes.
Specify Fixtures and Finishes. Throughout this process,and probably long before,you have been saving photos of kitchens you love into your ideabooks and folders.
Work on Design Development and Construction Documents. This is the stage where you finalize the design and prepare final floor plans,elevations,details and,if applicable,mechanical and electrical
Get Contractor Estimates. If you don’t already have a licensed contractor on your project,your next step is to find one to carry the project through.
Prepare for Demo. The big day is upon us,most likely about four to eight weeks from when you submitted for permits.
Get Through the Punch List. Once construction is over — well,almost over — there’s typically a list of items that are missing,wrong or simply forgotten about.